Set the project start and end points

A project normally starts at position 1 1 1 1 (as shown in the LCD, in Bars mode or in Bars and Time mode). You can move the project start point to an earlier position, allowing upbeats or program change commands to be played before the first downbeat. You can also move the project end point; for example, to remove unused bars at the end of the project.

Set the project start point

Set the project end point

Do one of the following:

Note: If the Project End display doesn’t appear in the LCD, Control-click the LCD and choose Customize Control Bar in the shortcut menu. Select the Tempo/Project End checkbox in the Customize Control Bar dialog.

During playback, a project stops when it reaches the Project End marker. When recording, the Project End marker moves to accommodate the end of the recording (if recording extends past the current position of the marker).